摘要
9号高炉自2019年实施大修扩容改造后,引入摆动溜槽拨罐出铁技术及嘉恒法渣处理工艺,在双铁口轮流出铁的出铁制度下,随着冶强的提高,总结炉前管理的难点与重点,阐述铁次对炉况的影响,并分析铁炉前管理经验。
After the overhaul and capacity expansion of No. 9 blast furnace in 2019, the swing chute cupping tapping technology and Jiaheng slag treatment process were introduced. Under the tapping system of double taphole tapping in turn, with the improvement of smelting strength, the difficulties and key points of pre furnace management were summarized, the influence of iron number on furnace condition was expounded, and the pre furnace management experience was analyzed.
作者
闫波
霍育军
Yan Bo;Huo Yujun(Ironmaking Plant of Shougang Changzhi Iron&Steel Co.,Ltd.,Changzhi Shanxi 046031)
出处
《山西冶金》
CAS
2022年第3期314-315,318,共3页
Shanxi Metallurgy
关键词
高炉
炉前出铁
铁口
出铁间隔
blast furnace
tapping in front of furnace
iron mouth
tapping interval