摘要
改革开放以来,沿海经济发展快速,很多区域出现了吹填造地,这就要求场地需要初步处理后,才可以交付后续其他项目进行建设.以某吹填区建筑场地初步处理为例,在满足项目要求的基础上比选了四种合适的不同方案,再通过对造价和效果的综合分析,推荐了最优方案,为吹填初步处理项目的方案比选提供了有益的借鉴.
Since the reform and opening up,the coastal economy has developed rapidly,and the reclamation by pumping filling has appeared in many areas,which requires that the site needs preliminary treatment before it can be delivered to the other subsequent projects for construction.Taking the preliminary treatment of a reclamation construction site as an example,four suitable different schemes are compared and selected on the basis of meeting the project requirements.And then the optimal scheme is recommended through the comprehensive analysis of the cost and effect,which provides a useful reference for the comparison and selection of the preliminary treatment projects of reclamation.
出处
《城市道桥与防洪》
2022年第6期254-256,259,共4页
Urban Roads Bridges & Flood Control
关键词
经济分析
建筑场地
地基处理
economic analysis
construction site
foundation treatment