不停航条件下大型枢纽机场的改扩建 被引量:1

Reconstruction and Expansion of Large Hub Airport Under Non-stop Condition
下载PDF
导出
摘要 以上海浦东国际机场三期扩建工程为背景,选择卫星厅S2及T2捷运车站工程为主要研究对象,对不停航条件下大型枢纽机场的改扩建施工技术进行了研究。重点针对紧邻运营机坪超大基坑施工、受限空间内捷运车站深基坑施工及改扩建施工,以及施工禁区内外不停航交通设计等工程问题给出了解决方案,所取得的成果可为国内外大型枢纽机场工程建设提供理论支持和经验参考。 Based on the phaseⅢexpansion project of Shanghai Pudong International Airport,the construction technology of reconstruction and expansion of large hub airport without suspension is studied by selecting the satellite hall S2 and T2 rapid transit station project as the main research object.In view of the engineering problems such as the construction of super large foundation pit close to the operation apron,the construction of deep foundation pit and reconstruction and expansion of MRT station in the confined space,and the design of non-stop traffic inside and outside the construction restricted area,the solutions are given.The results obtained can provide theoretical support and empirical reference for the construction of large hub airports at home and abroad.
作者 张敏 ZHANG Min(Shanghai Construction No.2(Group)Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2022年第4期800-802,共3页 Building Construction
关键词 枢纽机场 不停航 改扩建 深基坑 hub airport non-stop flight reconstruction and expansion deep foundation pit
  • 相关文献

参考文献2

二级参考文献1

共引文献2

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部