风电场吊装模拟系统在采乃风电场中的应用

Application of the Wind Power Hoisting Simulation System in Cainai Wind Farm
下载PDF
导出
摘要 结合普格采乃风电场实际情况,采用风电场吊装模拟系统(HoistSystem),在三维环境下模拟风电机组吊装过程,优化选择最为可行、经济、高效的吊装平台设计方案,使吊装平台设计布置更加科学,从而指导现场施工,减少施工安装时间,提高安装效率。降低了工程成本,提高了项目建设和运行效益。 Considering the actual conditions of Puge Cainai Wind Farm,a wind power hoisting simulation system(HoistSystem)is developed and adopted to simulate the hoisting process of wind turbine units in three-dimensional environment.Thus,we can optimize and select the most feasible,economic and efficient hoisting platform design scheme to guide the on-site construction,reduce the construction and installation time and improve the installation efficiency.With the system,the project cost is reduced and the construction and operation benefits are improved.
作者 柴亮 许海楠 王雅雯 廖心言 CHAI Liang;XU Hainan;WANG Yawen;LIAO Xinyan(Powerchina Chengdu Engineering Corporation, Chengdu 610072, China)
出处 《水电与新能源》 2022年第7期16-18,40,共4页 Hydropower and New Energy
关键词 风电场 吊装 模拟 设计 施工 wind farm hoisting simulation design construction
  • 相关文献

参考文献3

二级参考文献13

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部