摘要
不同的工程领域会引发不同的边坡工程问题,而露天高陡岩质边坡因为其特殊性,需要注意的问题与其他类型边坡有所不同。本文以Veladero露天矿边坡设计为例,将边坡设计与研究流程划分为调查、研究设计和生产三个阶段,总结了露天高陡岩质边坡工程设计基本流程。
Different engineering fields concern on different slope engineering issues, and the open-pit high-steep rock slopes are different from other types of slopes because of their particularity.Taking the Veladero open-pit slope design as an example, this paper divides the slope design and research process into three stages: investigation, research design and production, and summarizes the basic design process of open-pit high-steep rock slope engineering.
作者
钟福生
Zhong Fusheng(Zijin(Xiamen)Project Design Co.,Ltd.,Xiamen 361006,Fujian)
出处
《福建冶金》
2022年第4期7-9,共3页
Fujian Metallurgy
关键词
高陡岩质边坡
基本流程
三维岩土工程模型
high-steep rock slope
basic design process
three-dimensional geotechnical model