工期争议典型案例分析及防范建议

Analysis of Typical Cases of Construction Period Disputes and Preventive Suggestions
下载PDF
导出
摘要 本文主要采取实证研究的方法,筛选部分建设工程工期争议典型案例,结合相关法律依据及学界研究成果,并将其分为开工日期争议、工程延期争议、工期索赔争议三种类型进行分析。此外,按照建设工程项目管理的流程,从工程招投标、施工合同签订、施工过程管理、竣工验收结算四个环节提出相应的风险防范措施。本文的研究对指导承包人在工程建设过程中防范可能产生的工期风险,以及解决因工期引发的纠纷都有一定的实践价值。 This paper mainly adopts the method of empirical research to screen some typical cases of construction project duration disputes.Combined with the relevant legal basis and academic research results,Divided into three types:Commencement Date dispute,project delay dispute and duration claim dispute.In addition,according to the process of construction project management,corresponding risk prevention measures are put forward from four links:project bidding,construction contract signing,construction process management and completion acceptance settlement.The research of this paper has certain practical value for guiding the contractor to prevent the possible construction period risk in the process of project construction and solve the disputes caused by construction period.
作者 刘玲北 丁浩珉 LIU Lingbei;DING Haomin(Jiangsu Police Institute,Nanjing 210031,China)
机构地区 江苏警官学院
出处 《建筑经济》 北大核心 2022年第6期41-47,共7页 Construction Economy
基金 江苏省基建教育基本建设学会2021年度重点研究项目“高校基本建设规范化管理研究”(jyjb2021D003)。
关键词 工期争议 典型案例 防范建议 construction period dispute classic case preventive suggestions
  • 相关文献

参考文献7

二级参考文献9

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部