摘要
针对新疆伊宁县麻扎灌区渠道改造工程,设计了梯形、矩形和U形共3种断面结构型式的渠道,并基于模糊综合评价分析法对3种渠道结构型式进行对比分析。结果表明,梯形渠道在工程投资上表现最佳,而U形渠道在施工进度和抗冻性方面表现最佳;以工程投资、施工进度、抗冻胀性作为模糊综合评价因素,U形渠道为麻扎灌区最佳的渠道结构型式;梯形渠道在优先考虑抗冻胀性时刻作为第二选择,矩形渠道在优先考虑施工进度时可作为第二选择。
Aiming at the channel reconstruction project of Mazha irrigation area in Yining County,Xinjiang,three cross-section structure types of channels are designed,including ladder type,rectangular type and U-type,and the three channel structure types are compared and analyzed based on fuzzy comprehensive evaluation analysis method.The results show that the ladder channel performs best in engineering investment,while the U-channel performs best in construction progress and frost resistance;taking project investment,construction progress and frost heave resistance as fuzzy comprehensive evaluation factors,the results do not show that U-shaped channel is the best channel structure in Mazha irrigation area;ladder channel is the second choice when giving priority to frost expansion resistance,and rectangular channel can be the second choice when giving priority to construction progress.
作者
周富强
ZHOU Fu-qiang(Xinjiang Ruichang Design Institute Co.Ltd.,Urumqi 830000,China)
出处
《水利科技与经济》
2022年第6期29-32,共4页
Water Conservancy Science and Technology and Economy
关键词
渠道结构型式
模糊综合评价分析法
工程投资
施工进度
抗冻胀性
麻扎灌区
channel structure type
fuzzy comprehensive evaluation analysis method
project investment
construction progress
frost heave resistance
Mazha irrigation area