大连湾沉管隧道最终接头防水设计 被引量:6

Waterproofing Design of the Final Joints of Dalian Bay Immersed Tunnel
下载PDF
导出
摘要 大连湾沉管隧道采用了新型最终接头形式和施工工法——顶进节段法。为了解决传统的止水带无法满足该新型工法特殊环境下防水要求的问题,设计人员采用了可伸缩止水带、注浆止水带及其他防水措施。本文着重介绍顶进节段法的构造特点、防水设计,供同类工程作参考。 A new type of final joint and construction method——jacking segment method,are adopted in Dalian Bay immersed tunnel.In order to solve the problem that the traditional water stop cannot meet the waterproofing requirements of the new construction method under the special environment,the designers adopted retractable water stop,grouting water stop and other waterproofing measures.This paper mainly introduces the structural characteristics and waterproofing design of jacking segment method,which can be used as a reference for similar projects.
作者 任冬生 Ren Dongsheng(Shanghai Tunnel Engineering and Rail Transit Design and Research Institute,Shanghai200235,China)
出处 《中国建筑防水》 2022年第6期47-50,共4页 China Building Waterproofing
关键词 沉管隧道 顶进节段法 最终接头 可伸缩止水带 注浆止水带 immersed tunnel jacking segment method final joint retractable water stop grouting water stop
  • 相关文献

参考文献2

共引文献5

同被引文献30

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部