摘要
介绍了漳泽水库优化汛限水位的计算方法,从可操作性和蓄水条件两方面论述了优化汛限水位的必要性,通过非主汛期发生历史暴雨或设计洪水时优化汛限水位的安全性分析及“台阶式汛限水位”与优化汛限水位的风险对比,论证了漳泽水库优化汛限水位的可行性。
Introduces the calculation method of optimized flood limit water level of Zhangze Reservoir,and discusses the necessity of optimized flood limit water level from two aspects of operability and storage conditions.Through the safety analysis of the optimized flood limit water level in case of historical rainstorm or design flood in non main flood season and the risk comparison between stepped flood limit water level and the optimized flood limit water level.The feasibility of optimizing the flood limit water level of Zhangze Reservoir is demonstrated.
出处
《山西水利科技》
2022年第1期33-35,41,共4页
Shanxi Hydrotechnics
关键词
优化汛限水位
安全性
可行性
optimized flood limit water level
safety
feasibility