摘要
为提高城市雨水污水排放系统泵站机械设备的安装质量,基于泵站机械设备安装监管现状,分析了其存在的主要问题,总结了泵站排水系统主要机械设备的安装操作要点,并提出了泵站机械设备安装施工前、施工中以及施工后的全过程质量控制措施,以期通过对泵站机械设备安装质量进行全过程控制,以提高设备安装质量,充分做好城市雨水污水的排放工作,更好地保障城市的安全稳定发展.
In order to improve the installation quality of pumping station machinery and equipment of urban storm water drainage system,based on the current situation of pumping station machinery and equipment installation supervision,analyze the main problems,summarize the main machinery and equipment installation operation points of pumping station drainage system,and put forward the whole process quality control measures before,during and after the construction of pumping station machinery and equipment installation,in order to through the quality of pumping station machinery and equipment installation for The whole process control,can further improve the quality of equipment installation,fully do a good job of urban storm water and sewage discharge,to better ensure the safe and stable development of the city.
作者
向宇
Xiang Yu(Taiyuan City Drainage Management Center,Taiyuan Shanxi 030000)
出处
《机械管理开发》
2022年第5期318-319,322,共3页
Mechanical Management and Development
关键词
水泵
底座
机座
导轨
螺旋压榨机
安装
pump
base
seat
guide rail
screw press
installation