摘要
把运用BIM技术建立的三维建筑模型与运用无人机倾斜摄影测量技术建立的实景三维模型进行融合,融合后的三维模型可有效地整合各种资源,实现对工程施工全过程的监控管理。以雄安昝岗片区再生水厂工程为例,基于Fuzor平台将BIM建筑模型信息与无人机航测影像数据生成的真实三维地形模型相融合,并将融合模型用于工程,辅助进行施工三维可视化技术交底、进度管控、现场安全巡查等,旨在提高工程项目精细化施工与管理水平。
Integrate the 3D building model established by BIM Technology with the real scene 3D model established by UAV oblique photogrammetry.The integrated 3D model can effectively integrate various resources and realize the monitoring and management of the whole process of engineering construction.Taking the reclaimed water plant project in Xiong'an Zan’gang area as an example,based on the Fuzor platform,this paper integrates the BIM building model information with the real three-dimensional terrain model generated by UAV aerial survey image data,and uses the fusion model to assist the project in three-dimensional visualization technical disclosure,progress control and on-site safety inspection,so as to improve the fine construction and management level of the project.
作者
武炜
张丽丽
司典浩
郑佳荣
王博
李小利
杨欢欢
WU Wei;ZHANG Lili;SI Dianhao;ZHENG Jiarong;WANG Bo;LI Xiaoli;YANG Huanhuan(School of Civil and Surveying Engineering,Beijing Polytechnic College,Beijing 100042,China;Beijing Municipal Construction Group Co. ,Ltd. ,Beijing 100164,China)
出处
《北京工业职业技术学院学报》
2022年第2期1-5,共5页
Journal of Beijing Polytechnic College
基金
地铁与地下管廊工程施工安全保障关键技术研究(2017YFC0805400)
2020年北京工业职业技术学院重点科研课题(BGY2020KY—09Z)。