摘要
对于大坝长期观测而言,长度超过200 m的测斜管在以往工程中最终成活率较低。针对两河口水电站心墙区测斜管及电磁沉降管的设计与存活情况,提出了一种测斜管及电磁沉降管设计的优化思路并予以实施,取得了较好的效果,阐述了具体的优化思路。
For long-term observation of the dam,the final survival rate of the inclinometer pipe with a length of more than 200m is low in previous projects.In view of the design layout and survival of inclinometer and electromagnetic settlement pipe in the core wall area of Lianghekou Hydropower Station,an optimization idea for the design of inclinometer and electromagnetic settlement pipe is proposed and implemented,which has achieved good results,and the specific optimization idea is expounded in this paper.
作者
孙全
SUN Quan(Chengdu Engineering Co.,LTD,Chengdu,Sichuan,610072)
出处
《四川水力发电》
2022年第2期101-104,共4页
Sichuan Hydropower
关键词
土石坝
安全监测
测斜管
电磁沉降管
两河口水电站
设计与安装
earth and rock filled dams
safety monitoring
inclinometer pipe
electromagnetic settlement pipe
Lianghekou Hydropower Station
design and installation