摘要
随着海上油气田开采技术不断发展,海上油气田处理工艺及开采产量日益增加,对用电需求不断加大,对海上孤岛电网供电提出更高的挑战。为满足大功率设备的运行与用电安全,需利用大型透平发电机并网供电形式,开展各电压等级机组与高电压等级大型机组的组网技术研究。通过增加各电压等级发电机组与平台现有大容量机组进行组网以补充平台用电缺口,在降低改造工程投资的情况下解决电力缺口问题。
With the continuous development of offshore oil and gas field production technology,the treatment process and production output of offshore oil and gas fields are increasing,and the demand for electricity is increasing.It poses a higher challenge to the power supply of offshore island power grid.In order to meet the operation and power safety of high-power equipment,the grid connected power supply form of large turbine generator is used.Research on networking technology of various voltage level units and high voltage level large units.The power gap of the platform is supplemented by increasing the networking between the generator units of various voltage levels and the existing high-capacity units of the platform,so as to solve the power gap under the condition of reducing the investment of the reconstruction project.
出处
《今日自动化》
2022年第3期64-66,共3页
Automation Today
关键词
海洋石油平台
透平发电机组
搬迁工程设计
offshore oil platform
turbine generator set
relocation engineering design