摘要
为了促进BIM技术在电力行业变电站三维设计中的应用,解决电力行业建设、施工及管理等问题,针对典型固定式直流融冰项目整站BIM建模过程进行施工模拟、碰撞检查等应用分析,为固定式融冰装置变电站建设及后期运营维护提供技术支撑,对电力设备间的导线连接、金具选型设计优化、提高固定式融冰电力工程设计质量、工程现场安装、减少施工返工、缩短变电站建设周期等方面具有重要意义。
In order to promote the application of BIM technology in the three-dimensional design of substation in the power industry,and solve the problems in the construction and management of the power industry,this paper mainly discusses the application analysis of BIM modeling process for the whole station of typical fixed direct current ice-melting project,such as construction simulation and collision inspection,to provide technical support for the construction and later operation and maintenance of fixed ice-thawing device substation.It is of great significance to the wire connection among power equipments,the optimization of the selection and design of metal tools,the improvement of the design quality of fixed ice-thawing power engineering,the on-site installation of the project,the reduction of construction rework and the shortening of the construction cycle of the substation.
作者
徐文成
黄元媛
王宝
杨海华
Xu Wencheng;Huang Yuanyuan;Wang Bao;Yang Haihua(NR Electric Power Electronics Co., Ltd., Changzhou 213100, China;UHV Construction Branch of State Grid Corporation, Changzhou 213100 China;Nanjing Nanrui Jibao Engineering Technology Co., LTD, Nanjing 210000, China)
出处
《黑龙江科学》
2022年第8期70-72,共3页
Heilongjiang Science
关键词
BIM技术
变电站三维设计
施工模拟
碰撞检查
BIM technology
Three-dimensional design of the substation
Construction simulation
Collision inspection