固定式直流融冰工程BIM设计应用

BIM Design Application of Fixed Direct Current Ice Melting Project
下载PDF
导出
摘要 为了促进BIM技术在电力行业变电站三维设计中的应用,解决电力行业建设、施工及管理等问题,针对典型固定式直流融冰项目整站BIM建模过程进行施工模拟、碰撞检查等应用分析,为固定式融冰装置变电站建设及后期运营维护提供技术支撑,对电力设备间的导线连接、金具选型设计优化、提高固定式融冰电力工程设计质量、工程现场安装、减少施工返工、缩短变电站建设周期等方面具有重要意义。 In order to promote the application of BIM technology in the three-dimensional design of substation in the power industry,and solve the problems in the construction and management of the power industry,this paper mainly discusses the application analysis of BIM modeling process for the whole station of typical fixed direct current ice-melting project,such as construction simulation and collision inspection,to provide technical support for the construction and later operation and maintenance of fixed ice-thawing device substation.It is of great significance to the wire connection among power equipments,the optimization of the selection and design of metal tools,the improvement of the design quality of fixed ice-thawing power engineering,the on-site installation of the project,the reduction of construction rework and the shortening of the construction cycle of the substation.
作者 徐文成 黄元媛 王宝 杨海华 Xu Wencheng;Huang Yuanyuan;Wang Bao;Yang Haihua(NR Electric Power Electronics Co., Ltd., Changzhou 213100, China;UHV Construction Branch of State Grid Corporation, Changzhou 213100 China;Nanjing Nanrui Jibao Engineering Technology Co., LTD, Nanjing 210000, China)
出处 《黑龙江科学》 2022年第8期70-72,共3页 Heilongjiang Science
关键词 BIM技术 变电站三维设计 施工模拟 碰撞检查 BIM technology Three-dimensional design of the substation Construction simulation Collision inspection
  • 相关文献

参考文献9

二级参考文献34

共引文献144

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部