天然气长输管道工程造价每个环节都有着极高的效果和作用,各个环节相互组合形成完善的整体。建设工程变化情况决定了整个天然气长输管道工程造价实际变化情况,会给企业经济效益带来直接影响。因此在天然气长输管道工程项目建设中,需要强化对工程造价全过程管理工作,完善各项工作要点,制定相应的管理制度,在加快工程建设项目进度的基础上确保竣工时间,将社会效益和经济效益最大化,从而实现天然气长输管道工程造价的经营目标。文章主要结合天然气长输管道的特征,提出了加强天然气长输管道工程造价全过程控制策略,有助于提升企业的经济效益。
From the current situation of specif ic cost control of natural gas long-distance pipeline project, each link has a very high effect and function, which is combined with each other to form a perfect whole. Based on this, the change of the construction project determines the actual change of the cost of the whole long-distance natural gas pipeline project, and even has a direct impact on the enterprise economy. In this situation, it is necessary to strengthen the whole process management of the cost of natural gas long-distance pipeline project, improve various key points of work, formulate corresponding management systems, ensure the completion time on the basis of accelerating the progress of the project, and maximize the social and economic benef its, so as to achieve the business goal of the management of cost in natural gas long-distance pipeline project. Combined with the characteristics of natural gas long-distance pipeline, this paper puts forward the strategy of strengthening the whole process control of natural gas long-distance pipeline project cost, so as to improve the economic benef its.
作者
段碧山
DUAN Bi-shan(Guangdong Energy Group Pipeline Co.,Ltd.,Guangzhou 510630,China)
出处
《化工管理》
2022年第11期24-27,共4页
Chemical Engineering Management
关键词
天然气
长输管道
工程造价
全过程控制
natural gas
long distance pipeline
project cost
whole process control