期刊文献+

装配式建筑施工现场管理问题原因分析与优化措施研究 被引量:14

Cause Analysis and Optimization Measures of Prefabricated Building Construction Site Management Problems
下载PDF
导出
摘要 近年来,装配式建筑在我国取得了良好的发展成效。随着装配式建筑的快速发展,其施工现场的管理问题也随之而来。结合装配式建筑施工技术特性,对装配式建筑施工现场存在质量管理和安全管理问题进行研究,并采用5M1E分析法对其引发原因进行分析。在此基础上,从6S管理理论角度出发提出相应的管理优化措施,以期为提高装配式建筑施工现场管理效率提供参考。 In recent years,prefabricated building has achieved good results in China.With the rapid development of prefabricated building,its construction site management problems also follow.In this paper,combined with the characteristics of prefabricated building construction technology,the problems of quality management and safety management in prefabricated building construction site are studied,and the causes are analyzed by 5M1E analysis method.On this basis,from the perspective of 6S management theory,the corresponding management optimization measures are put forward,in order to provide reference for improving the efficiency of prefabricated construction site management.
作者 曹家玮 李强 陈兵 魏宏亮 党利荣 CAO Jiawei;LI Qiang;CHEN Bing;WEI Hongliang;DANG Lirong(Gansu Tianshui Green Assembly Industry Development Co.,Ltd.,Tianshui Gansu 741099,China;Gansu Construction Investment Technology Research Co.,Ltd.,Lanzhou Gansu 730050,China)
出处 《工程质量》 2022年第2期24-27,共4页 Construction Quality
关键词 装配式建筑 现场管理 6S管理 优化措施 prefabricated building site management 6S management optimization measures
  • 相关文献

参考文献4

二级参考文献2

共引文献5

同被引文献86

引证文献14

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部