摘要
通过陕西东庄施工供水项目逐级加压泵站高扬程自平衡多级离心泵安装技术的实践经验,从水泵和电机安装前的各项准备、安装顺序和泵联轴器与电机联轴器同轴度的校正安装技术,以及调试和运行整个过程施工实践经验进行总结说明,详细介绍联轴器同轴度和端面间隙检查校正简易快捷的方法,以便供后续类似工程项目安装人员参考借鉴。
The installation technology of Shaanxi Dongzhuang construction water supply project has practical significance.It uses a high-lift self-balancing multi-stage centrifugal pump of a step-by-step booster pump station.This article summarizes and explains the construction practice experience from the installation technology and the whole process of commissioning and operation.It includes the preparations before the installation of the pump and the motor,the installation sequence,and the correct installation technology for the coaxiality of the pump coupling and the motor coupling.This article introduces in detail the simple and quick method of checking and correcting the coaxiality and end gap of the coupling.It can be used as reference for follow-up similar project installers.
作者
魏翠霞
杨勇
Wei Cuixia;Yang Yong(China Hydropower Construction Group Tenth Engineering Bureau Co.,Ltd.,Xi'an 712000,Shaanxi)
出处
《陕西水利》
2022年第1期31-33,共3页
Shaanxi Water Resources
关键词
高扬程
离心泵
电机
联轴器
安装技术
调试运行
High head
centrifugal pump
motor
coupling
installation technology
commissioning and operation