摘要 依托某220 kV城区架空输电线路工程建设,介绍了重覆冰区双回路窄基钢管塔杆塔规划、设计过程及设计成果等情况,重点阐述了铁塔真型试验方案,并对构件应力及挂点位移作了对比分析,提出了窄基钢管塔的非线性效应、主斜材刚度比、次弯矩影响等方面的设计优化建议。 Based on the construction of a 220 kV urban overhead transmission line project,this paper introduces the tower planning,design process and design results of double circuit steel tube tower with narrow base in heavy icing area.This paper focuses on the test scheme of the full-scale model test,and makes a detailed comparative analysis of the member stress and hanging point displacement,and obtains the design optimization suggestions on the nonlinear effect,the stiffness ratio of main diagonal material and the secondary bending moment.
作者 徐明鸣 袁星 孙铭泽 徐鹏 刘许凡 XU Mingming;YUAN Xing;SUN Mingze;XU Peng;LIU Xufan(China Energy Engineering Group Hunan Electric Power Design Institute Company Limited,Changsha 410007,China;State Grid Jiangsu Electric Power Engineering Consulting Company Limited,Nanjing 210024,China)
出处 《吉林电力》 2022年第1期29-31,56,共4页 Jilin Electric Power
关键词 重覆冰区 窄基钢管塔 非线性 真型试验 heavy icing area steel tube tower with narrow base nonlinearity full-scale model test
  • 相关文献

参考文献7

二级参考文献25

共引文献22

同被引文献16

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部