期刊文献+

慈林山煤矿矿井水处理扩容提标改造设计 被引量:1

Reconstruction Design of Expanding Capacity and Raising Standard for Mine Water Treatment in Cilinshan Coal Mine
下载PDF
导出
摘要 针对慈林山煤矿矿井水处理站处理能力不足,扩容改造处理站。分析扩容改造的必要性和扩容提标改造流程。改造后,矿井水处理站能力由原来的4500 m^(3)/d提升到7500 m^(3)/d,且处理后污染物排放量更低,周围水资源得到保护。 In view of the lack of treatment capacity of the mine water treatment station in Cilinshan Coal Mine, the capacity of the treatment station is expanded and transformed. The necessity of capacity expansion and the process of capacity expansion and bid raising are analyzed. After the transformation, the capacity of the mine water treatment station is increased from 4500 m^(3)/d to 7500 m^(3)/d, the discharge of pollutants is lower after treatment, and the surrounding water resources are protected.
作者 崔丽芳 Cui Lifang(Shanxi Lu'an Chemical Group Cilinshan Coal Industry Co.,Ltd.Cilinshan Coal Mine,Shanxi Changzhi 046600)
出处 《山东煤炭科技》 2022年第2期200-202,共3页 Shandong Coal Science and Technology
关键词 矿井水 处理 扩容提标 改造 mine water treatment expand capacity and raise bid reform
  • 相关文献

参考文献2

二级参考文献20

共引文献22

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部