1Mei-yung Leung, Yee-shan chart, Paul Olomolaiye.Impact of stress on the performance of construction project managers[J].Journal of Construction Engineering and Management, 2008, 134 (8) : 644-652. 被引量:1
2Maheswari J Uma, Koshy Varghese, Sridharan T.Application of dependency structure matrix for activity sequencing in concurrent engineering projects[J].Journal of Construction Engineering and Management, 2006,132 (5) :482-490. 被引量:1
4Vallee T, Basar T. Off-line compution of stackelberg solutions with the genetic algorithm[J].Computational Economics, 1999, 13(3):201-209. 被引量:1
5Erenguc S S, Tufekci S, Zappe C J.Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993, 40:25-50. 被引量:1
6Patterson J H, Taibot F B, Slowinski R, et al..Computational experience with a backtracking algorithm fro solving a general class of precedence and resource-constrained scheduling problems[J].European Journal of Operational Research,1990,49:68-79. 被引量:1
7Sung C S, Lim S K. A project activity scheduling problem with net present value measure[J].International Journal of Production Economics,1994,94:177-187. 被引量:1