期刊文献+

基于造价分析某地下连续墙槽壁塌方处理方案研究

Research on Treatment Scheme of Slot Wall Collapse of a Diaphragm Wall Based on Cost Analysis
下载PDF
导出
摘要 我国城市建设前几十年如火如荼,现今发达地区已进入高质量发展阶段,这就不可避免地要求基坑围护越来越多的采用可靠性较高的地下连续墙方案,但由于地质条件的千变万化,突发事件也越来越多。以某地下连续墙槽壁塌方处理为例,通过对造价和效果的分析,介绍事件的处理方案,可以为类似项目提供有益的参考。 The urban construction has been in full swing for decades in China,and now the developed areas have entered the stage of high-quality development,which inevitably requires more and more reliable diaphragm wall schemes for foundation pit support However,due to the ever-changing geological conditions,there are more and more emergencies.Taking the treatment of slot wall collapse of a diaphragm wall as an example,through the analysis of cost and effect,the treatment scheme of the event is introduced,which can provide a useful reference for similar projects.
作者 谢林汝 XIE Linru
出处 《城市道桥与防洪》 2022年第1期250-252,255,M0021,M0022,共6页 Urban Roads Bridges & Flood Control
关键词 地下连续墙 槽壁塌方 造价分析 diaphragm wall slot wall collapse cost analysis
  • 相关文献

参考文献4

二级参考文献5

共引文献101

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部