期刊文献+

受老空水威胁工作面巷道防治水实践 被引量:1

Practice of Preventing and Controlling Water in Roadway of Working Face Threatened by Empty Water
下载PDF
导出
摘要 针对高庄煤矿3_(上)1104回风巷为沿空掘巷,巷道掘进期间受3_(上)1102老空水威胁,掘进开采存在严重的水患安全问题,采用超前打设疏水孔的方案来治理老空水威胁,对巷道采用调向增大护巷煤柱厚度等措施实现巷道安全快速掘进,探放水期间无淹巷情况发生,探放水后巷道顶板和上帮无淋水现象发生。 In view of the fact that the No.3_(upper) 1104 return air roadway in Gaozhuang Coal Mine is driven along the goaf,the roadway is threatened by No.3_(upper) 1102 old empty water during tunneling,and there is a serious flood safety problem in tunneling,so the scheme of setting drainage holes in advance is adopted to control the threat of old empty water.The roadway adopts measures such as adjusting direction to increase the thickness of coal pillar to realize safe and rapid tunneling,no flooding occurs during water exploration and discharge,and no watering occurs in the roof and upper side of the roadway after water exploration and discharge.
作者 李凤申 马坡 崔岩 Li Fengshen;Ma Po;Cui Yan(Gaozhuang Coal Industry Co.,Ltd.,Shandong Jining 272195)
出处 《山东煤炭科技》 2022年第1期169-170,177,共3页 Shandong Coal Science and Technology
关键词 沿空掘巷 老空水 钻孔疏放 driving roadway along goaf old empty water drilling hole drainage
  • 相关文献

参考文献5

二级参考文献27

共引文献7

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部