4×30m道岔连续梁预应力施工技术分析 被引量:2

Construction Technology Analysis of Prestressed Continuous Beam of 4×30m Switch
下载PDF
导出
摘要 为探讨4×30m道岔连续梁预应力施工技术的应用要点,以轨道交通Z4线一期工程土建施工第2合同段4×30m道岔连续梁为研究背景,对预应力施工技术的优势,及预应力施工技术在4×30m道岔连续梁工程中的应用进行详细分析。轨道交通4×30m道岔连续梁工程项目施工难度较大,影响质量的因素多,采用预应力施工技术可有效降低施工难度,更好的控制混凝土裂缝,提升道岔连续梁施工质量,值得在类似工程中推广应用。 In order to discuss the key points of application of prestressed construction technology of 4×30 m continuous beam, taking the second contract section of 4× 30 m continuous beam of civil construction of Z4 line as the research background, the advantages of prestressed construction technology and the application of prestressed construction technology in 4×30 m continuous beam project are analyzed in detail. Rail transit 4× 30 m turnout continuous beam engineering project construction is difficult, affecting the quality of many factors, the use of prestressed construction technology can effectively reduce the difficulty of construction, better control of concrete cracks, improve the turnout continuous beam construction quality, worthy of promotion and application in similar projects.
作者 许丹 XU Dan(Fourth Engineering Co.Ltd.,China Railway 18th Bureau Group,Tianjin 300300,China)
出处 《兰州石化职业技术学院学报》 2021年第4期20-23,共4页 Journal of Lanzhou Petrochemical Polytechnic
关键词 4×30m道岔连续梁 预应力 波纹管 张拉 4×30m turnout continuous beam prestress bellows stretch-draw
  • 相关文献

参考文献7

二级参考文献30

共引文献32

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部