期刊文献+

土压平衡盾构河底长距离全断面富水砂层施工技术 被引量:2

Construction Technology of Earth Pressure Balance Shield Tunneling on Long-Distance Full-Section Water-Rich Sand Layer at River Bottom
下载PDF
导出
摘要 土压平衡盾构机在富水砂层掘进时易出现喷涌现象,造成地面沉降、坍塌等环境风险,当其在河底穿越长距离类似地层时,风险大幅增加。论文依托福州地铁4号线某盾构工程,从设备管理、渣土改良、掘进及注浆、应等方面进行研究,并采取针对性措施使工程顺利实施,为类似工程提供借鉴。 The earth pressure balance shield machine is prone to gushing phenomenon when tunneling in water-rich sand layer, resulting in environmental risks such as ground settlement and collapse. The risk increases dramatically when it passes through similar long-distance formations at the bottom of the river. Based on a shield tunneling project of Fuzhou Metro Line 4, this paper studies from the aspects of equipment management, slag improvement, tunneling and grouting, etc., and takes targeted measures to ensure the smooth implementation of the project, providing reference for similar projects.
作者 黄春来 饶伟 HUANG Chun-lai;RAO Wei(CCCC Third Harbor(Xiamen)Engineering Co.Ltd.,Xiamen 361006,China)
出处 《工程建设与设计》 2022年第1期121-123,共3页 Construction & Design for Engineering
关键词 土压平衡盾构 富水砂层 渣土改良 掘进参数 应急方案 earth pressure balance shield water-rich sand layer muck improvement tunneling parameters emergency plan
  • 相关文献

参考文献2

二级参考文献6

共引文献11

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部