摘要
在城市化日渐进步的过程中,城区内架空线路施工与城市规划的矛盾日渐明显,在很多时候对城市的现代化进程造成了一定的阻碍。因此,市政电力隧道施工中的技术选择尤为重要,工程企业需根据市政电力隧道的特点,对比明挖法、盾构法和顶管法等的优势,选择最为可行的施工技术。顶管施工有着独特的优势,在很多市政电力隧道工程中都有良好的应用,基于此,本文详细分析了关于市政电力隧道施工中的顶管技术应用,对工程建设具有重要的指导价值。
In the process of urbanization,the contradiction between overhead line construction and urban planning in urban areas is becoming more and more obvious,which often hinders the process of urban modernization.Therefore,the technology selection in the construction of municipal power tunnel is particularly important.Engineering enterprises need to select the most feasible construction technology according to the characteristics of municipal power tunnel and its advantages over open excavation method,shield method and pipe jacking method.Pipe jacking construction has unique advantages and has good applications in many municipal power tunnel projects.Based on this,this paper analyzes the application of pipe jacking technology in municipal power tunnel construction in detail,which has important guiding value for engineering construction.
作者
李凤龙
LI Fenglong(Beijing Jiutongqu Testing Technology Co.,Ltd.,Beijing 100071)
出处
《智能建筑与工程机械》
2021年第11期36-38,共3页
Intelligent Building and Construction Machinery
关键词
市政电力隧道
顶管施工
技术应用
municipal power tunnel
pipe jacking construction
technology application