摘要
为更准确地评估施工风险,保障施工安全,根据风险定义从风险发生概率和风险发生损失两方面对地铁车站深基坑施工风险进行分析,以层次分析法为原理基础,将数理统计数据应用于模糊综合评价法。对南宁轨道交通5号线狮山公园站深基坑施工风险总值及各风险因素风险值进行评估。经评估,该工程施工风险处于最低合理可行区域,并给出应注意的主要风险因素以及相应的控制措施。后续监测结果显示,该工程在采取相应控制措施后,主要风险得到有效控制,工程安全得到保障。
In order to evaluate construction risk more accurately and to ensure construction safety,metro station deep foundation pit construction risk is analyzed from the two aspects of risk occurrence probability and risk loss,according to the definition of risk.Mathematical statistical data are applied to fuzzy comprehensive evaluation method based on the principle of analytic hierarchy process.Assessment of the total risk value of deep foundation pit construction of Shishan Park Station of Nanning Rail Transit Line 5 and of the risk value of various risk factors is carried out.Results show that the construction risk of the project is in the lowest reasonable and feasible range according to evaluation,and the main risk factors that should be paid attention to are listed,as well as corresponding control measures.Following monitoring results show that with adoption of the corresponding control measures,main risks of the project are effectively controlled,and the project safety is guaranteed.
作者
蒙国往
黄劲松
吴波
农忠建
许杰
韦汉
MENG Guowang;HUANG Jinsong;WU Bo;NONG Zhongjian;XU Jie;WEI Han(College of Civil Engineering and Architecture,Guangxi University,530004,Nanning,China)
出处
《城市轨道交通研究》
北大核心
2021年第12期55-60,共6页
Urban Mass Transit
基金
国家自然科学基金资助项目(51678164,51478118)。
关键词
地铁车站
深基坑
施工风险评估
数理统计
模糊综合评价法
metro station
deep foundation pit
construction risk assessment
mathematical statistics
fuzzy comprehensive evaluation method