期刊文献+

沪苏通铁路桥4G/5G漏缆覆盖方案 被引量:1

4G/5G leaky cable coverage scheme of Shanghai-Suzhou-Nantong
下载PDF
导出
摘要 在高速铁路无线信号覆盖工程中,大跨度的铁路桥一直是通信专业方案设计与现场施工的重点与难点。文章为解决沪苏通铁路大桥无线信号场强覆盖问题,提出了模拟现场漏缆吊挂铺设的测试方案,并且通过工程实际测试加以验证,为同类型铁路项目无线通信覆盖工程的漏缆系统设计提供了参考。 In the wireless signal coverage engineering of high-speed railway, the large-span railway bridge has always been the key and difficult point in the scheme design and site construction of communication specialty.In order to solve the problem of wireless signal field strength coverage of Shanghai-Suzhou-Nantong Railway Bridge, this paper puts forward a test scheme to simulate the laying of cable leakage suspension on site, and it is verified by the actual engineering test, which provides a reference for the design of cable leakage system of wireless communication coverage engineering of similar railway projects.
作者 陆懿 奚伟俊 顾文喆 Lu Yi;Xi Weijun;Gu Wenzhe(Nantong Branch of China Tower Co.,Ltd.,Nantong 226000,China)
出处 《无线互联科技》 2021年第21期14-15,共2页 Wireless Internet Technology
关键词 沪苏通铁路桥 漏缆 5G 吊挂 覆盖 Shanghai-Suzhou-Nantong railway bridge the leakage cable 5G hanging coverage
  • 相关文献

参考文献5

二级参考文献22

共引文献28

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部