钻爆法施工隧道工装配套设计及工序标准化控制研究 被引量:5

Research on Machinery Matching Design and Process Standardization Control in Tunnelling by Drilling and Blasting Method
下载PDF
导出
摘要 为解决传统钻爆法施工隧道时存在机械化程度低、施工人员劳动强度大、施工进度缓慢等问题,文章以宜彝高速公路飞蛾山隧道为工程背景,从施工组织方案、机械化工装作业配套方法、工序施工标准化管理等方面进行分析,提出了一套适用于钻爆法施工隧道的工装配套技术及工序标准化控制方案。实际效果表明:相较于传统钻爆法施工,工装配套快速施工大幅度提升了施工进度,减少了生产成本,降低了施工人员的施工风险;实施工序标准化控制可明显缩短各工序所需时间。通过工装配套设计和工序标准化控制,飞蛾山隧道Ⅳ、Ⅴ级围岩段施工每循环在传统工艺的基础上可分别节约23.85 h和27.5 h,取得了较好的社会效益和经济效益,实现了飞蛾山隧道的快速安全施工。 In order to solve the problems of low mechanization level,high labor intensity and slow construction progress in tunnelling by conventional drilling and blasting method,taking Feieshan tunnel on Yibin-Yiliang expressway as the engineering background,the detailed analysis is carried out from the aspects of construction organization scheme,mechanized equipment operation matching method,construction process standardization management,etc.,and the machinery matching technology and process standardization control scheme are put forward,which are suitable for tunnelling by drilling and blasting method.The actual construction effects show that,compared with the conventional drilling and blasting method,using the machinery matching technology it can greatly improve the construction progress,reduce the production cost and lower the construction risk;and by implementing process standardization control it can significantly shorten the time required for each process.In the construction of GradeⅣand GradeⅤsurrounding rock sections of Feieshan tunnel,by means of machinery matching design and process standardization control it can save 23.85 h and 27.5 h per cycle respectively compared with the traditional construction technology,achieving good social and economic benefits,and realizing the rapid and safe construction of Feieshan tunnel.
作者 李武伦 蒋证全 LI Wulun;JIANG Zhengquan(China Railway City Development and Investment Group Co.Ltd.,Chengdu 610218)
出处 《现代隧道技术》 CSCD 北大核心 2021年第6期210-217,共8页 Modern Tunnelling Technology
关键词 公路隧道 钻爆法施工 工装配套 工序标准化 Highway tunnel Drilling and blasting construction method Construction machinery matching Process standardization
  • 相关文献

参考文献11

二级参考文献100

共引文献139

同被引文献68

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部