摘要
以新孟河奔牛枢纽工程为例,详细分析施工模型协同方式、施工模型族命名规则,BIM模型拆分标准,设定了与施工过程相关的基本信息,并通过二次开发完成了施工信息的快速赋值与提取,从而实现在施工过程中对枢纽单元工程质量、进度等方面管控,为BIM在水利工程中的深入应用提供参考与借鉴。
Taking Benniu hub project of Xinmeng River as an example,the collaborative mode of construction model,the naming rules of construction model family and the separation standard of BIM model was analyzed in detail,the basic information related to the construction process was set,and the rapid assignment and extraction of construction information through secondary development was completed,so as to realize the control of project quality and progress of hub units in the construction process,and provide reference for the in-depth application of BIM in water conservancy projects.
作者
吝江峰
王海俊
陈蕾蕾
LIN Jiangfeng;WANG Haijun;CHEN Leilei(Jiangsu Water Conservancy Survey and Design Institute Co.,Ltd.,Yangzhou 225127,China)
出处
《江苏水利》
2021年第11期46-50,共5页
Jiangsu Water Resources
基金
江苏省水利科技资助项目(2018067,2019012)。
关键词
信息模型(BIM)
施工建设期
二次开发
仿真模拟
进度控制
information modeling(BIM)
construction period
secondary development
simulation
schedule control