大采高坚硬顶板综放面“注-爆”一体卸压防冲技术 被引量:5

Coal Bump Prevention Technology of"Injection-Blasting"Integrated by Pressure Relief in Fully Mechanized Top-coal Caving Face of Hard Roof with Large Mining Height
下载PDF
导出
摘要 针对千米深井综放工作面采场应力大、地质力学环境复杂、受开采扰动作用强、易诱发冲击地压等问题,分析了工作面冲击地压诱发及控制机理,提出了煤层注水+基本顶预裂爆破的“注-爆”一体化卸压防冲技术。通过对比不同注水孔及爆破孔布置间距条件下,采场超前支承压力分布特征、弹性应变能释放规律等,确定了大采高综放工作面注水及爆破钻孔的最优布置间距,在有效降低工作面冲击倾向的同时实现了较好的经济效益。 In view of the problems of large stope stress,complex geomechanical environment,strong mining disturbance and easy to induce rock burst in fully mechanized top-coal caving face of kilometer deep coal mine,the mechanism of inducing and controlling of rock burst in coalface is analyzed,and the coal bump prevention technology of“injection-blasting”integrated by pressure relief is proposed.By comparing the distribution characteristics of advance abutment pressure and the release law of elastic strain energy under different spacings of water injection holes and blasting holes,the optimal spacing of water injection and blasting holes in fully mechanized top-coal caving face with large mining height is determined,which can effectively reduce the impact tendency of coalface and achieve better economic benefits.
作者 李雁 LI Yan(School of Civil Engineering,Xuzhou University of Technology,Xuzhou 221000,China)
出处 《煤炭技术》 CAS 北大核心 2021年第11期86-89,共4页 Coal Technology
基金 徐州市重点研发计划(KC20176,KC18090)。
关键词 千米深井 冲击地压 综放工作面 卸压 弹性应变能 kilometer deep coal mine rock burst fully mechanized top-coal caving face pressure relief elastic strain energy
  • 相关文献

参考文献10

二级参考文献92

共引文献166

同被引文献58

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部