摘要
某卫生所因框架柱柱脚混凝土疏松,故局部置换混凝土后采用外包型钢和增大柱脚横截面积两种方式进行加固处理。本文介绍了某卫生所置换混凝土的加固处理方法,着重阐述了置换混凝土的全施工过程,希望能为同类工程提供参考。
Due to the loose concrete at the base of the frame column in a health center,the partial replacement of concrete was adopted,and then the steel was wrapped and the section was enlarged.This paper introduces the reinforcement method of concrete replacement in a health center,and focuses on the whole construction process of concrete replacement,so as to provide a reference for similar projects.
作者
浦绍武
Pu Shaowu(Yunnan Key Laboratory of Building Structure and New Materials,Kunming Yunnan 650223,China)
出处
《城市建筑》
2021年第27期144-146,共3页
Urbanism and Architecture
关键词
卫生所
临时支撑
框架柱置换混凝土
监测
health center
temporary support
frame column replacement concrete
monitoring