摘要
就神朔线分相区布置和车载自动过分相装置配置情况,以及地面控制自动过分相和车载自动过分相的控制原理、特点,针对不同编组形式的列车在通过分相区时存在的问题进行了分析,制定了相应措施,并为后续电力机车自动过分相型式的选择提供参考。
In this paper,the layout of electric phase separation of Shenshuo railway is introduced.We compare the difference in principle between ground automatic scheme and locomotive automatic scheme,and analyzes the problems in the passing phase of trains in different formation forms.In the end,we propose some solutions.
作者
刘文进
付上源
摄靖凯
LIU Wenjin;FU Shangyuan;SHE Jingkai(Baoshen Railway Group Locomotive Branch,Shenmu 719300,China)
出处
《技术与市场》
2021年第11期34-36,共3页
Technology and Market
关键词
电力机车
自动过分相
无线重联
electric locomotive
articulated phase insulator
locomotive’s wireless connection