灯泡贯流式机组厂房进水口胸墙是整个河床式厂房防渗的关键部位,其施工质量直接关系到厂房结构及机组运行的安全。介绍了老挝南欧江四级水电站厂房进水口薄壁胸墙施工过程中采取的质量控制措施,所取得的经验可为后续类似工程提供参考。
The breast wall of the powerhouse intake is the key part to prevent seepage of riverbed ground powerhouse.The construction quality is directly related to the safety of the powerhouse structure and the operation of the generators.This paper introduces the quality control measures taken during construction of the thin breast wall of the powerhouse of the Nam Ou 4 Hydropower Station in Laos,and experience accumulated can be referenced by subsequent similar projects.