摘要
武汉南湖初雨处理厂是武汉市南湖水环境提升工程中的核心子项工程。初雨处理厂临湖布置,采用叠合结构半地埋的形式,存在临湖超大深基坑、工艺工况复杂、需要绿建模拟等设计难点。设计过程采用建筑信息模型(BIM)技术进行建模辅助设计,通过BIM应用使项目设计质量、协同沟通和设计周期等方面均得到了提升。阐述了项目设计过程BIM技术的相关重点应用及应用过程,为初雨处理厂的BIM设计提供经验。
Wuhan Nanhu initial rainwater treatment plant is the core sub-project of the South Lake water environment improvement project. The initial rainwater treatment plant is arranged next to the lake and adopts a superimposed structure semi-buried form. The project is facing several design difficulties, such as large and deep foundation pits adjacent to the lake, complex process conditions and green building analysis requirement. In the design process, building information modeling(BIM) technology was employed to assist the modeling design, and project design quality, collaborative communication and design cycle were improved through the application of BIM. Relevant key points and application process of BIM technology in the design process were summarized, which provides experience for BIM design of initial rainwater treatment plant.
作者
龙程理
李璐
陈燕波
吴迪
白快
LONG Cheng-li;LI Lu;CHEN Yan-bo;WU Di;BAI Kuai(Central and Southern China Municipal Engineering Design&Research Institute Co.Ltd.,Wuhan 430014,China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2021年第18期82-87,共6页
China Water & Wastewater
关键词
BIM
初雨处理厂
深基坑
叠合结构
绿建分析
BIM
initial rainwater treatment plant
deep foundation pits
superimposed structure
green building analysis