摘要 对于车站结构来讲,深基坑支护、土方开挖工作安全影响因素较多,如果不做好安全专项施工就有可能导致安全事故的发生。因此,必须要加强安全方面的重视程度,对施工现场情况进行深入了解,采取有效的深基坑支护以及土方开挖策略,保证项目整体质量以及安全,保证深基坑支护结构在车站工程项目中发挥出应有的作用和效果。基于此,下文就郑州西站二期附属结构深基坑支护与土方开挖安全专项施工展开论述。 In terms of station structure,there are many factors affecting safety in deep foundation pit support and earth excavation.If the safety special construction is not done well,it may lead to safety accidents.Therefore,it is necessary to strengthen the importance of safety,have an in-depth understanding of the construction site situation,adopt effective deep foundation pit support and earth excavation strategies to ensure the overall quality and safety of the project,and ensure that the deep foundation pit support structure is in the station project The project has played its due role and effect.Based on this,the following discusses the special construction of deep foundation pit support and earth excavation safety of the second phase of Zhengzhou West Railway Station.
作者 李二宝 LI Er-bao(Traffic Engineering Branch of China Railway Sixth Bureau Group Co.,Ltd.,Beijing 102300,China)
出处 《价值工程》 2021年第31期121-123,共3页 Value Engineering
关键词 二期附属结构 深基坑支护 土方开挖 安全施工 second-stage auxiliary structure deep foundation pit support earth excavation safe construction
  • 相关文献

参考文献3

二级参考文献16

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部