期刊文献+

Joint optimization of inspection, maintenance, and spare ordering policy considering defective products loss 被引量:1

下载PDF
导出
摘要 This paper proposes a joint inspection-based maintenance and spare ordering optimization policy that considers the problem of integrated inspection,preventive maintenance,spare ordering,and quality control for a four-state single-unit manufacturing system.When an inspection detects a minor defect,a second phase inspection is initiated and a regular order is placed.Product quality begins to deteriorate when the system undergoes a severe defect.To counter this,an advanced replacement of the minor defective system is carried out at the Jth second phase inspection.If a severe defect is recognized prior to the Jth inspection,or if system failure occurs,preventive or corrective replacement is executed.The timeliness of replacement depends on the availability of spare.We adopt two modes of ordering:a regular order and an emergency order.Meanwhile,a threshold level is introduced to determine whether an emergency order is preferred even when the regular order is already ordered but has not yet arrived.The optimal joint inspection-based maintenance and spare ordering policy is formulated by minimizing the expected cost per unit time.A simulation algorithm is proposed to obtain the optimal two-phase inspection interval,threshold level and advanced replacement interval.Results from several numerical examples demonstrate that,in terms of the expected cost per unit time,our proposed model is superior to some existing models.
出处 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2021年第5期1167-1179,共13页 系统工程与电子技术(英文版)
基金 This work was supported by the National Natural Science Foundation of China(71471015) the Social Science Fund Base Project of Beijing(19JDGLA001).
  • 相关文献

参考文献1

二级参考文献14

  • 1Armstrong, M.J. & Atkins, D.R. (1996). Joint optimization of maintenance and inventory policies for a simple system. IIE Transactions, 28:415-424. 被引量:1
  • 2Barlow, R. & Hunter, L. (1960). Optimum preventive maintenance policies. Operations Research, 8:90-100. 被引量:1
  • 3Chien, Y.H. (2005). Generalized spare ordering policies with allowable inventory time. International Journal of Systems Science, 20:823-832. 被引量:1
  • 4Cleroux, R., Dubuc, S. & Tilquin, C. (1979). The age replacement problem with minimal repair and random repair cost. Operations Research, 27:1158-1167. 被引量:1
  • 5Dohi, T., Kaio, N. & Osaki, S. (1998). On the optimal ordering policies in maintenance theory - survey and applications. Applied Stochastic Models and Data Analysis, 14: 309-321. 被引量:1
  • 6Jhang, J.P. (2001). A generalized age replacement policy with random delivery time and inspection. International Journal of Systems Science, 32:321-329. 被引量:1
  • 7Nakagawa, T. & Kowada, M. (1983). Analysis of a system with minimal repair and its application to replacement theory. European Journal of Operational Research, 12:176-182. 被引量:1
  • 8Nakagawa, T. & Osaki, S. (1974). Optimum replacement policies with delay. Journal of Applied Probability, 11:102-110. 被引量:1
  • 9Osaki, S. (1977). An ordering policy with lead time. International Journal of Systems Science, 8:1091-1095. 被引量:1
  • 10Osaki, S. & Yamada, S. (1976). Age replacement with lead time. IEEE Transactions on Reliability, 25:344-355. 被引量:1

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部