摘要
以羊易电站二期工程为研究对象,结合现有的资源条件,通过不同发电方案和光热配置方案之间的比选,对地热/光热联合开发进行了初步探索。最终推荐羊易电站二期工程采用装机规模26 MW,且不设储热系统的ORC地热/光热联合发电方案。
The power generation scheme for the second stage project of Yangyi Power Station is studied.Considering the present resources conditions,two power generation schemes and the photo-thermal configuration schemes are compared.The geo-thermal and photo-thermal combined power generation mode is preliminarily explored.Finally,it is recommended for the second stage project of Yangyi Power Station to adopt the organic Rankine cycle(ORC)geo-thermal and photo-thermal combined power generation scheme with installed capacity of 26 MW and without heat storage system.