摘要
综合管廊工程设计的内容极为庞杂,电气控制方案设计需结合管廊的整体特征进行灵活多变的方案调整。结合以往工程案例,采用PLC及组态软件集成管廊ACU系统并实现对管廊排水与通风系统的监控,部分改进综合管廊内部信息的采集及传输方式,采用485总线和5G网络并行传输的方式实现高效快速的信息传送。
The content of comprehensive pipe gallery engineering design is very complex,and the electrical control scheme design needs to be adjusted flexibly according to the overall characteristics of the pipe gallery.In this paper,combined with the previous engineering cases,PLC and configuration software are used to integrate the ACU system and realize the monitoring of the drainage and ventilation system of the pipe gallery.The collection and transmission mode of the internal information of the comprehensive pipe gallery are partially improved.The parallel transmission mode of 485 Bus and 5G network is adopted to realize the efficient and fast information transmission.
作者
李洁
白志永
LI Jie;BAI Zhiyong(School of Information Engineering,Inner Mongolia University of Science and Technology,Baotou 014010,China)
出处
《电工技术》
2021年第18期24-25,28,共3页
Electric Engineering
关键词
综合管廊
5G
环境与设备监控系统
utility tunnel
5G
environment and equipment monitoring system