期刊文献+

某污水处理厂改造设计及效果分析

Reconstruction design and effect analysis of a sewage treatment plant
下载PDF
导出
摘要 以泰州城南第二污水处理厂为例,对该污水厂改造前实际运行情况、改造方案、设计参数和改造后运行效果进行分析,并对出现的新问题提出解决措施。通过对原初沉池、氧化沟进行改造优化,新增碳源投加装置和高效絮凝沉淀池,改造成适应“低碳高氮”特点的“A^(2)/O+高效絮凝沉淀池”污水处理工艺,提高污水总氮和SS的去除率,改造后该污水处理厂出水指标稳定达到GB 18918—2002城镇污水处理厂污染物排放标准一级A排放标准。 Taking Taizhou Chengnan No.2 sewage treatment plant as an example,analyzes the actual operation situation,transformation scheme,design parameters and operation effect of the plant before transformation,and solves the new problems.Through the transformation and optimization of the original primary sedimentation tank and carrousel oxidation ditch,the carbon source dosing device and high-efficiency flocculation sedimentation tank were added,and the sewage treatment process of“A 2/O+high-efficiency flocculation sedimentation tank”adapted to the characteristics of“low carbon and high nitrogen”was transformed to improve the removal rate of total nitrogen and SS.After the transformation,the effluent index of the sewage treatment plant was stable,reaching the“Emission Standard of Pollutants for Urban Sewage Treatment Plants”GB 18918—2002 class a emission standard.
作者 丁海燕 Ding Haiyan(Hyflux New Spring(Taizhou)Co.,Ltd.,Taizhou 225300,China)
出处 《山西建筑》 2021年第21期119-121,131,共4页 Shanxi Architecture
关键词 污水处理厂 改造 低碳高氮 高效絮凝沉淀池 sewage treatment plant transformation low carbon and high nitrogen high efficiency flocculation sedimentation tank
  • 相关文献

参考文献5

二级参考文献29

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部