摘要
介绍烈性传染病住院楼的设计特点、负荷分级、负荷计算和变配电系统,总结其电气专业的设计要点,分析新建和改造过程中出现的难点问题。
The design features,load classification,load calculation as well as the power transformation and distribution system of the fulminating infectious disease inpatient building are introduced,the key design points in electrical discipline are summarized,and the challenges in the process of construction and reconstruction are analyzed.
作者
韩瀛
乌聪敏
HAN Ying;WU Congmin(Tianjin University Research Institute of Architectural Design and Urban Planning Co.,Ltd.,Tianjin 300072,China)
出处
《建筑电气》
2021年第9期63-67,共5页
Building Electricity
关键词
烈性传染病
应急传染病住院楼
负压病房
三区两通道
柴油发电机房位置
负荷分级
电源配置
电能质量
fulminating infectious disease
emergency infectious disease inpatient building
negative pressure ward
three areas and two channels
location of diesel generator room
load classification
power configuration
power quality