摘要
该文回顾了我国引进苏联钢结构工程施工验收标准、增加焊工钢印要求的标准演变历程,讲述我国古代物勒工名制度与我国钢结构工程施工质量验收规范中焊工钢印规定的关系,并分析焊工钢印规定存在的历史原因、技术弊端。该文认为,应加强事前工艺评定和焊缝检测管理,借助更具可追溯性的施工记录、竣工图、声像资料等现代档案管理技术实现与实物分离记责。
This paper reviews the standard evolution process where the acceptance standard of Soviet Union's steel-structure engineering construction was introduced and welders'steel seals were required,describes the relationship between the workers'names-sealing system and the welders'steal sealing requirement in construction quality acceptance specification of steal structure projects in China,and analyzes the historical causes and technical shortcomings of such specification.This paper proposes that the prior procedure qualification and weld inspection management should be strengthened,and with the help of modern archive management technologies like construction records,as-built drawings,audio-visual materials with greater traceability,the accountability can be separated from the physical objects.
作者
窦有义
刘永棵
赵刚
孙大勇
Dou Youyi;Liu Yongke;Zhao Gang;Sun Dayong
出处
《重庆建筑》
2021年第9期61-63,共3页
Chongqing Architecture
关键词
钢结构
无损检测
档案记录
焊工钢印
steal structure
non-destructive testing
file records
welders'steel seal