广钢高炉炼铁系统工程设计及采用的新技术 被引量:1

Design of ironmaking engineering in Guangxi Iron and Steel Co.by new technology
下载PDF
导出
摘要 介绍了广钢炼铁系统(一期)建造年产生铁920万t的3800 m^(3)高炉设计特点和采用的先进技术。高炉设计中采用了高炉长寿、软水密闭结合净环水冷却技术、高风温高顶压、大富氧喷煤、均压放散煤气回收、环保WHBJ渣处理、低耗及清洁生产等一系列国内外先进的大型高炉技术,所有高炉炼铁系统设计和技术代表了当前高炉炼铁的最高装备水平,这些技术的使用保证了高炉生产实现“高效、低耗、长寿、清洁”的目标。 The design features and advanced technologies of the 3800m^(3) blast furnace with an annual iron production of 9.2 million tons built by the Guangzhou Iron and Steel Ironmaking System(Phase I)are introduced.The design of the blast furnace adopts a series of domestic and international such as long life of the blast furnace,soft water tightness combined with clean circulating water cooling technology,high air temperature and high-top pressure,large oxygen-enriched coal injection,pressure equalization and gas recovery,environmentally friendly WHBJ slag treatment,low consumption and clean production,etc.Advanced large-scale blast furnace technology,all blast furnace ironmaking system designs and technologies represent the highest level of equipment for blast furnace ironmaking.The use of these technologies ensures that blast furnace production achieves the goal of"high efficiency,low consumption,longevity and cleanliness".
作者 阎峰 YAN Feng(Guangxi Iron and Steel Group Co.,Ltd.,Ironworks,Liuzhou 545000,Guangxi,China)
出处 《四川冶金》 CAS 2021年第4期21-23,共3页 Sichuan Metallurgy
关键词 大型高炉 工程设计 新技术 large blast furnace engineering design new technology
  • 相关文献

参考文献10

二级参考文献55

  • 1邹忠平,王刚,赵瑞海,熊拾根,郭宪臻,谷少党.高炉节能减排的研究现状和研究方向建议[J].钢铁技术,2012(1):1-5. 被引量:7
  • 2张寿荣.炼铁系统节能——我国钢铁工业21世纪技术进步的重点[J].钢铁,2005,40(5):1-4. 被引量:46
  • 3张春霞,齐渊洪,严定鎏,胡长庆,张旭孝.中国炼铁系统的节能与环境保护[J].钢铁,2006,41(11):1-5. 被引量:28
  • 4ZHANG Shou rong, YIN Han. Technological Progress of China's Ironmaking after Its Annual Tonnage Surpassed 100 mtons in 1995[A]. The 3rd ICSTI Proeeedings[C]. Germany Dtisseldorf, 2003:44. 被引量:1
  • 5ZHANG Shou-rong, YIN Han. Challenges to China's Ironmaking Industry in the First Two Decades of 21st Century [A]. The 4th International Congress on the Science and Technology of Ironmaking Proceedings[C]. Japan Osaka, 2006: 18. 被引量:1
  • 6ZHANG Shou-rong, YIN Han. The Current Situation and Existing Problems of Blast Furnace Ironmaking in China[A]. 2na CSM-VDEh-Seminar on Metallurgical Fundamentals[C], Germany Dusseldorf, 2007. 被引量:1
  • 7ZHANG Shou-rong. Development Trends of the Iron and Steel Industry in the First Part of the 21st Century and the Challenges Facing China[J]. Macroeeonomics, 2008, 1: 3. (in Chinese). 被引量:1
  • 8吴复忠,蔡九菊,杜涛,张琦,陈春霞.铁水能耗分析及其节能方向与途径[J].中国冶金,2007,17(8):45-51. 被引量:5
  • 9ZHANG Shou-rong,YIN Han.Technological Progress of China's Ironmaking After Its Annual Tonnage Surpassed 100 mtons[A].1995 3^rd ICSTI Proceedings[C].Düsseldorf:2003.44-49. 被引量:1
  • 10ZHANG Shou-rong,YIN Han.Challenges to China's Ironmaking Industry in the First Two Decades of 21st Century Proceedings[A].The 4^th International Congress on the Science and Technology of Ironmaking[C].Osaka:2006.18-28. 被引量:1

共引文献174

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部