摘要
以信阳市五岳水库作为工程实例,提出了适用于除险加固水库后评价中综合评价的成功度评价模型,并建立了综合评价指标体系和评价方法,得出了五岳水库除险加固成功度评价值,从而验证了该水库除险加固项目是成功的,同时也是对水库除险加固项目后评价工作一次具有前瞻性的探索和尝试。
This paper puts forward a success-degree comprehensive evaluation model,a post-evaluation method applicable to reservoir reinforcement effect of Xinyang Wuyue Reservoir whose success-degree evaluation value is obtained through creating a comprehensive index evaluation system and an evaluation method.This evaluation points to the fact that the reinforcement of Wuyue Reservoir is successful.It is also a prospective exploration of reservoir reinforcement.
作者
王宏伟
王伟
高全
Wang Hongwei;Wang Wei;Gao Quan(Xinyang Water Conservancy and Hydropower Project Construction Quality Monitoring Station,Xinyang 464000,China;Changjiang Institute of Survey,Planning,Design and Research,Wuhan 430010,China;National Dam Safety Research Center,Wuhan 430010,China)
出处
《山西建筑》
2021年第18期176-178,共3页
Shanxi Architecture
基金
国家重点研发计划:基于大数据的大坝安全诊断与预警关键技术(2018YFC0407104)。
关键词
病险水库
除险加固
后评价
成功度
dangerous reservoir
reinforcement
post-evaluation
success degree