摘要 为解决10202综放工作面侧向支承压力对相邻工作面巷道影响,通过工作面围岩赋存特征分析和FLAC模拟计算不同煤柱宽度、切顶角度、切顶高度下侧向支承压力分布,确定10202工作面切顶深度24 m、角度0°比较经济合理。 In order to solve the influence of lateral abutment pressure of the 10202 fully mechanized top coal caving face on adjacent working face roadway,the distribution of lateral abutment pressure under different coal pillar width,roof cutting angle and roof cutting height was calculated through analysis of surrounding rock occurrence characteristics and FLAC simulation.The cutting depth of the 10202 working face is 24 m and the angle is 0°,which is more economical and reasonable.
作者 高军 李根威 崔世荣 Gao Jun;Li Genwei;Cui Shirong(Zhongyang County Emergency Management Bureau,Shanxi Zhongyang 0334005;Lvliang University,Shanxi Lishi 033000;Shanxi Lvliang Zhongyang Fujiayan Coal Industry Co.,Ltd.,Shanxi Zhongyang 033400)
出处 《山东煤炭科技》 2021年第8期73-75,78,共4页 Shandong Coal Science and Technology
基金 2020年吕梁市重点研发项目“基于超声波探测的透明工作面三维精准建模关键技术”(2020GXZDYF22)。
关键词 综放 沿空 切顶 深度 fully mechanized top coal caving along the air top cutting depth