摘要
随着不对称高压脉冲轨道电路(以下简称高压脉冲轨道电路)的广泛应用,现场维修人员对设备原理掌握不清,导致在处理故障时处理能力相对较弱。通过一起典型案例分析在查找处理GZ-2007A型高压脉冲轨道电路故障时,发现的因施工调整不当,导致轨道电路故障的案例,通过此次高压脉冲轨道电路的故障处理,来了解GZ-2007A型高压脉冲轨道电路的工作原理,为日后现场维修及类似故障的发生与查找提供一定的参考,以提高维修管理水平和技术业务素质。
With the wide application of asymmetric high-voltage pulse track circuit(hereinafter referred to as high-voltage pulse track circuit),the fi eld maintenance personnel are not clear about the principle of the equipment,which leads to the relatively weak ability in dealing with faults.This paper analyzes a typical case of track circuit fault caused by improper construction adjustment when fi nding and handling GZ-2007A high-voltage pulse track circuit fault.Through the fault handling of this high-voltage pulse track circuit,we can understand the working principle of GZ-2007A high-voltage pulse track circuit,In order to improve the level of maintenance management and the quality of technical services,it can provide some reference for the future on-site maintenance and the occurrence and search of similar faults.
作者
刘安波
王双
Liu Anbo;Wang Shuang
出处
《铁路通信信号工程技术》
2021年第S01期99-102,共4页
Railway Signalling & Communication Engineering
关键词
高压脉冲
扼流阻抗补偿器
故障处理
电气特性调整
施工
high voltage pulse
choke impedance compensator
troubleshooting
electrical characteristic adjustment
construction