罗源湾2×5万吨级码头结构选型 被引量:1

Structure selection for 2×50,000 DWT wharf in Luoyuan bay
下载PDF
导出
摘要 由于地质条件复杂,罗源湾北岸2×5万吨级码头结构选型较为困难。为了解决此问题,对类似地质条件下的码头结构展开了调研和对比分析,进行码头结构方案优选。从技术可行性和经济合理性角度,对优选的透空式前板桩高桩码头结构进行分析。同时收集了码头实测数据,并与计算结果进行对比,从而验证了透空式前板桩高桩码头结构的可靠性和经济合理性。 Due to the complex geological condition, it has a great difficulty to select the structure for the 2×50,000 DWT wharf in Luoyuan bay. To tackle this problem, research and comparative analysis of the wharf structure under similar geological conditions are carried out, and the structure scheme of the wharf is optimized. From the perspectives of technical feasibility and economic rationality, the optimal high piled wharf with the top opened frontal steel sheet pile structure is analyzed.At the same time, the measured data of the on-site survey and operation parameters of the completed wharf are collected and compared with the calculated results, thus verifying the reliability and economic rationality of the structure of the pile high piled wharf with top opened frontal steel sheet piles.
作者 郑天立 ZHENG Tian-li(CCRC International Co.,Ltd.,Beijing 100855,China)
出处 《水运工程》 北大核心 2021年第8期61-66,共6页 Port & Waterway Engineering
关键词 前板桩高桩码头 透空结构 结构选型 high piled wharf with frontal sheet piles open structure structure selection
  • 相关文献

参考文献6

二级参考文献4

  • 1戴炳坤,尹海卿.洋山港一期工程水工码头AB标驳岸及码头的沉降和位移[J].港工技术与管理,2005(4):3-9. 被引量:1
  • 2吴鹏程,朱明有.洋山深水港区一期工程水工码头C标段驳岸施工技术[C]//港口工程分会技术交流文集.北京:中国土木工程学会,2005:396-402. 被引量:1
  • 3王现中.上海洋山深水港三期工程变形监测与分析[J/OL].城市建设理论研究,2013(4).http://www.qikan.com.cn/article/csjl/esjl201304/csjl2013042517.html. 被引量:1
  • 4全国一级建造师执业资格考试用书编写委员会编写,张余庆.港口与航道工程管理与实务[M]中国建筑工业出版社,2004. 被引量:1

共引文献14

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部