摘要
PPP模式在我国市政工程中得到了广泛的运用,为解决市政道路工程风险控制难、风险周期长、风险因素多的问题,依托南宁市市政道路工程,采用风险识别、风险评价、风险分担及风险控制的方法,研究了市政道路工程PPP项目全过程的风险管理,得到以下结论:1)全过程风险包括政治风险、法律风险、金融风险、建设风险、运营风险、移交风险、信用风险和其他风险共8类风险类型;2)利用灰色关联分析法确定出13项市政道路关键风险;3)针对工程的风险类别,结合风险分担方可实施的措施,提出了合适的风险管理策略,可在类似工程中推广。
PPP model has been widely used in China,s municipal engineering.In order to solve the problems of difficult risk control,long risk cycle,and multiple risk factors in municipal road projects,Nanning municipal road projects is taken as an example.By adapting methods of risk identification,risk evaluation,risk sharing and risk control,the risk management of the whole process of PPP model of municipal road projects is researched.The main conclusions are as follows:1)The whole process risk includes risks of political,legal,financial,construction,operation,handover,credit and other risk;2)13 key municipal road risks can be determined by gray correlation analysis;3)According to the risk categories,combined with the intelligence of the risk sharing party,it provides effective control measures which can be promoted in similar projects.
作者
马辉敢
Ma Huigan(Nanning Urban Construction Investment Development Co.,Ltd.,Nanning 530033,China)
出处
《市政技术》
2021年第6期162-165,共4页
Journal of Municipal Technology