摘要 喀双隧洞T4勘探试验洞采用TBM方法掘进施工,在施工过程中出现了卡机现象。结合场地地质情况确定后方拱架段0+699-0+717 m采用喷锚支护及径向固结注浆加固措施;侧顶护盾及刀盘周围采用化学注浆加固。围岩加固后启动机器使得机器脱困。 TBM method was adopted in the construction of T4 exploration test tunnel of Kashuang Tunnel,which resulted in machine jam.Combined with the geological conditions of the site,it is determined that the 0+699-0+717 m rear arch section is reinforced by shotcrete anchor support and radial consolidation grouting;the side top shield and cutterhead are reinforced by chemical grouting.After the reinforcement of surrounding rock,the machine starts and it makes the machine get rid of trouble.
作者 赵鹏飞 ZHAO Peng-fei
出处 《山西水利科技》 2021年第2期46-48,60,共4页 Shanxi Hydrotechnics
关键词 TBM 卡机 脱困方案 TBM jam scheme to get rid of trouble