摘要
新建长赣铁路是国家“八横八纵”高速通道之一渝长厦铁路通道的重要组成部分,是京港澳、京港(台)通道的重要联络通道。针对萍乡地区的线站位方案,结合地质条件、站位条件、工程实施难度和环境敏感点等影响因素进行了方案综合比选,最终确定本段线位推荐方案。
The newly-designed Changsha-Ganzhou High-Speed Railway is an important part of the Chongqing-Changsha-Xiamen railway corridor,one of the national"eight horizontal and eight vertical"high-speed passages.It is also a significant corridor connecting the Beijing-Hong Kong-Macao and Beijing-Hong Kong(Taiwan)passages.According to the rail line and station plan of Pingxiang area,combined with geological conditions,station conditions,project implementation difficulties,Environmentally sensitive points,and other influencing factors,a comprehensive comparison and selection of the schemes were carried out,and the recommended rail line position of this design section was finally determined.
作者
刘攀
LIU Pan(China Railway SIYUAN Survey and Design Group Co.,Ltd,Wuhan 430063)
出处
《铁道勘测与设计》
2021年第3期13-16,共4页
Railway Survey and Design
关键词
新建铁路
影响因素
方案比选
Newly railway
Influencing factors
scheme comparison and select