综合管廊标准化快速施工技术 被引量:2

Standardized Rapid Construction Technology for Utility Tunnel
下载PDF
导出
摘要 当前现浇综合管廊施工中,传统施工工法多采用底板、侧墙和顶板分2次浇筑的方式,所涉及的钢筋绑扎、模板支设及混凝土浇筑也均分2次进行施工。对此,根据综合管廊的结构特点,阐述了综合管廊钢筋骨架和模板整体支设一次浇筑完成的施工新方法,以期为高速、优质、安全地建造综合管廊提供可靠的技术保证。 At present,in the construction of cast-in-place utility tunnel,the traditional construction method mostly adopts the method of pouring the bottom plate,side wall and top plate in two times,and the steel bar binding,formwork erection and concrete pouring are also carried out in two times.In this regard,according to the structural characteristics of the utility tunnel,this paper expounds the new construction method of one-time overall concrete pouring of reinforcement cage and formwork for the utility tunnel,so as to provide reliable technical guarantee for the construction of the utility tunnel with high speed,high quality and safety.
作者 王鹏 王天野 郭少杰 WANG Peng;WANG Tianye;GUO Shaojie(China MCC20 Group Corp.,Ltd.,Shanghai 201900,China)
出处 《建筑施工》 2021年第7期1346-1348,共3页 Building Construction
关键词 现浇管廊 钢筋骨架 整体绑扎 移动内模 整体浇筑 cast in place utility tunnel reinforcement cage overall binding moving internal mold integral pouring
  • 相关文献

参考文献2

二级参考文献10

共引文献4

同被引文献20

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部